Automation 2 min read
Modernizing control without stopping operations: how it’s done
How to migrate obsolete PLCs, DCS and SCADA in phases, with FAT and SAT testing and a rollback plan, without losing production hours.
Resources
Calculate, compare and learn before you invest. All free, no sign-up.
How much your operation loses for every hour it stops, and how much you gain by reducing stoppages.
OpenHow ready is your operation? Ten questions that place it in the cycle and tell you where to start.
OpenThree facilities in 3D: scan, plan, installation, control, AI and training. Also in mixed reality.
OpenEach solution on one page, ready to download as PDF and share with your team.
OpenAs-built, BIM, SCADA, FAT, CMMS, OEE and more, explained without jargon.
OpenWhere we have shared what we learn in the field.
Open
Automation 2 min read
How to migrate obsolete PLCs, DCS and SCADA in phases, with FAT and SAT testing and a rollback plan, without losing production hours.
Data 2 min read
Why tracking environmental, safety and quality rules in spreadsheets is a risk, and four steps to comply with data measured at the source.
Engineering 2 min read
The difference between a 3D model and a digital twin, what it takes to build one and four uses that already create value in operations.
/ Contact
The first step is an asset assessment. An engineer answers, not a form.
Local time
Get directionsLocal time
Get directionsLocal time
Get directionsLocal time
Get directions